A Five Phase Pilot for Proving Workforce Readiness Value

Orgesa Berisha
Category
Podcasts
Date

A pilot should answer a decision. Should the organization continue, change the approach or scale the solution?
Many pilots cannot answer that question because they begin without a clear baseline, representative users or agreed success measures.
They generate activity but little evidence.
A stronger pilot is designed as a structured operational test.
Phase 1 Define the decision
Begin with one meaningful problem.
For example:
New employees complete training successfully but require extensive manager support during their first weeks in live operations.
Then define the decision the pilot should support:
Can realistic practice and earlier readiness evidence reduce avoidable support after go-live?
Izet Isufi’s delivery approach starts with this clarity because it keeps the pilot connected to an operational outcome.
Phase 2 Establish the baseline
Measure what happens before introducing the new workflow.
Depending on the use case, the baseline may include:
Time to proficiency
Early quality results
Escalation rates
Coaching requirements
Manager time
Productivity
Readiness results
Select only measures connected to the original problem.
Phase 3 Prepare the operating conditions
The pilot needs more than configured technology.
Confirm:
The knowledge is current and approved
Scenario ownership is clear
Managers understand the evidence
Employees know what is expected
A representative user group is included
Feedback channels are available
The pilot runs long enough to observe the intended outcome
This is where product delivery becomes operational preparation.
Phase 4 Observe behaviour and outcomes
Track two categories separately.
Adoption evidence
Did the intended users participate?
Did managers use the information?
Did the workflow fit existing responsibilities?
Where did users encounter friction?
Outcome evidence
Did capability improve?
Did employees enter live work better prepared?
Did coaching become more targeted?
Did manager workload change?
Did operational results improve?
High usage without outcome improvement is not sufficient. Neither is a positive outcome produced by a workflow users cannot sustain.
Phase 5 Make the scaling decision
At the end of the pilot, review:
What changed
Which assumptions were confirmed
Which assumptions were incorrect
What created friction
What must change before expansion
Whether the evidence justifies scaling
Izet’s position is that scaling should be an evidence-based decision, not the automatic next step after a pilot.
A successful pilot does not need to show that everything is perfect.
It needs to give stakeholders enough clarity to decide what happens next.
For the delivery principles behind this model, watch the conversation with Izet Isufi or listen on Spotify.